The pictures on this page are in chronological order. The most recent pictures are located at the top of this page. The oldest pictures are located at the bottom of this page. NOTES: Many thanks to the employees of Dynamic Sports Construction (Travis & Missy, Chris, Brian) for their tireless effort with the installation of this floor. Much of the material (including the recycled rubber tire base mat) used in the construction of this floor was made in Pennsylvania.
The pictures below were taken on or after April 9, 2010.