The pictures on this page are in chronological order. The most recent pictures are located at the top of this page. The oldest pictures are located at the bottom of this page.
The pictures below were taken on or after September 23, 2009: the brick facade begins. Interior walls begin October 6.

pictured above: masons work to complete south end of FLC (10/19/09)

pictured above: completed studding for kitchen & restrooms pictured above: studding begins for stage and adjacent rooms

pictured above: studding begins for kitchen & restrooms